Meeting 20110906
Jump to navigation
Jump to search
Development
- Joseph has made a lot of commits: http://code.google.com/p/archivematica/source/list#1682
- Joseph been working on some testing, with the bad name sips. I seem to be having a problem with one of the control documents, that's in a "%" directory. He suspects it's database related.
- Joseph added exit status to exit codes in the MCP, and had those codes write to the job logging, to re-implement the colour coding in the dashboard.
- Joseph had some problems with SIP creation, where watched directories weren't "stopping watching" even when they were moved out of the sip creation directory. This caused some major problems while processing. I have a work around implemented, but it puts "ERRORS" into the MCP output log. Note: that log does not appear in the dashboard. He onsidering that a low priority, as currently it's working.
- Austin has been updating the debian package files to catch up to some source changes over the last month. daily builds are working again
Deployment
- Evelyn will contact RAC to check on the status of their email processing
Documentation
- Nothing new
Testing
- Lately Joseph has seen a couple of Jobs lock up in the MCP, on jobs that activate on each file. He did some testing this morning and hasn't seen it yet.