Meeting 20111109
Jump to navigation
Jump to search
Development
- Joseph has been testing and such with scalability issues
- Successes with a large number of files
- He will build today the path around the watched directories for SIP creation
- He thinks he still need to look at the thread creation (SIP creation)... looks like some threads spawn and aren't removed. Deciding how to manage that, might get bumped to 0.9.
- Peter suggests to have a scalability refactor discussion very early on in the 0.9 development schedule.
- There are lot of remaining issues, a Monday code freeze is not realistic
- We can bump code freeze by a week, that then still leaves 2 weeks between code freeze and release.
- Evelyn to update the issue list and mark more criticals now that we're getting close
- Austin: ace is up and monitoring ~1000 documents
- Meeting scheduled on Mon, Nov 14 11am
Documentation
Evelyn updated Significant characteristics of raster images wiki page
Deployment
- Tomorrow, CVA and UBC
- Evelyn and Austin will do the RAC install the week of Dec 12
- That could get us an extra week in the 0.8 dev schedule