Difference between revisions of "Ingest (0.5)"
Jump to navigation
Jump to search
| Line 150: | Line 150: | ||
*Click OK to close pop-up window | *Click OK to close pop-up window | ||
*Close Xena | *Close Xena | ||
| − | |4.3 Transform content information | + | |4.3 Transform content information (UC-1.3, step 9) |
|- | |- | ||
|Normalized files are saved to AIP preparation folder | |Normalized files are saved to AIP preparation folder | ||
| Line 161: | Line 161: | ||
| | | | ||
*A log file showing all the actions taken by Xena will appear: /home/demo/accessionreports/xena_log.0. | *A log file showing all the actions taken by Xena will appear: /home/demo/accessionreports/xena_log.0. | ||
| − | | | + | | |
|- | |- | ||
|Archivist moves PDI in accessions folder to SIP in AIP preparation folder | |Archivist moves PDI in accessions folder to SIP in AIP preparation folder | ||
| Line 177: | Line 177: | ||
| | | | ||
*A script called BagIt will run in the background, converting the SIP into a single zipped file. In Archivematica, this zipped file, which also includes metadata generated by the bagging process, constitutes the AIP. For more information about BagIT, see [http://www.digitalpreservation.gov/library/challenge/data-transfer.html http://www.digitalpreservation.gov/library/challenge/data-transfer.html]. | *A script called BagIt will run in the background, converting the SIP into a single zipped file. In Archivematica, this zipped file, which also includes metadata generated by the bagging process, constitutes the AIP. For more information about BagIT, see [http://www.digitalpreservation.gov/library/challenge/data-transfer.html http://www.digitalpreservation.gov/library/challenge/data-transfer.html]. | ||
| − | | | + | |UC-1.3, step 10 |
|- | |- | ||
|AIP is moved to AIP receipt folder | |AIP is moved to AIP receipt folder | ||
Revision as of 17:37, 20 November 2009
Main Page > Documentation > Release 0.5 Documentation > Ingest (0.5)
AD1 Receive SIP
File:Archivematica AD1 ReceiveSIP v1.pdf
| Workflow diagram step | Description | UML diagram references |
|---|---|---|
| Producer places SIP in shared folder on host machine |
|
1.3 Assign network storage for SIP (UC-1.1) |
| SIP appears in shared folder in Archivematica |
|
1.4 Receive SIP from Producer (UC-1.1) |
| Archivist copies SIP from shared folder to SIP backup folder |
|
AD2 Audit SIP
File:Archivematica AD2 AuditSIP v5.pdf
| Workflow diagram step | Description | UML diagram references |
|---|---|---|
| Archivist moves SIP from shared folder into quarantine |
|
2.1 Quarantine SIP |
| SIP is quarantined for 2 minutes |
|
2.1 Quarantine SIP |
| SIP is scanned for malware |
|
2.2 Check SIP for malware |
| Infected files are sent to possiblevirii folder |
|
2.4 Audit SIP for compliance |
| Virus-checker report is sent to accessions folder |
|
2.4 Audit SIP for compliance |
AD3 Accept SIP for Ingest
File:Archivematica AD3 AcceptSIPforIngest v4.pdf
| Workflow diagram step | Description | UML diagram references |
|---|---|---|
| SIP contents are identified and validated using FITS |
|
3.3 Identify formats (UC-1.2, step 3) |
| Identification/validation reports are sent to accessions folder |
|
3.3 Identify formats (UC-1.2, step 3) |
| Accession log is sent to accessions folder |
|
AD4 Generate AIP
File:Archivematica AD4 GenerateAIP v2.pdf
| Workflow diagram step | Description | UML diagram references |
|---|---|---|
| SIP is moved to AIP preparation folder |
|
4.2 Add content information to AIP |
| Archivist normalizes files |
|
4.3 Transform content information (UC-1.3, step 9) |
| Normalized files are saved to AIP preparation folder |
|
4.3 Transform content information |
| Normalization log is saved to accessions folder |
|
|
| Archivist moves PDI in accessions folder to SIP in AIP preparation folder |
|
4.5 Add PDI to AIP |
| Archivist moves SIP to AIP generation folder |
|
|
| SIP content and PDI are zipped into AIP |
|
UC-1.3, step 10 |
| AIP is moved to AIP receipt folder |
|
AD5 Transfer AIP to Archival Storage
File:Archivematica AD5 TransferAIPtoArchivalStorage v2.pdf
| Workflow diagram step | Description | UML diagram references |
|---|---|---|
| Archivist moves AIP to archival storage folder |
|
5.2 Transfer AIP to archival storage |
| Archivist deletes SIP from SIP backup folder |
|
5.7 Destroy SIP and AIP copies |