(Created page with '== Development == * Joseph has been testing and such with scalability issues ** Successes with a large number of files ** He will build today the path around the watched directo...')
 
Line 10: Line 10:
 
* Evelyn to update the issue list and mark more criticals now that we're getting close
 
* Evelyn to update the issue list and mark more criticals now that we're getting close
 
* Austin: ace is up and monitoring ~1000 documents
 
* Austin: ace is up and monitoring ~1000 documents
* '''Meeting scheduled on Mon, Nov 13 11am'''
+
* '''Meeting scheduled on Mon, Nov 14 11am'''
  
 
== Documentation ==
 
== Documentation ==
Line 20: Line 20:
 
* Tomorrow, CVA and UBC
 
* Tomorrow, CVA and UBC
 
* Evelyn and Austin will do the RAC install the week of Dec 12
 
* Evelyn and Austin will do the RAC install the week of Dec 12
** That oculd get us an extra week in the 0.8 dev schedule
+
** That could get us an extra week in the 0.8 dev schedule
  
 
== Chat log ==
 
== Chat log ==

Revision as of 13:00, 9 November 2011

Development

  • Joseph has been testing and such with scalability issues
    • Successes with a large number of files
    • He will build today the path around the watched directories for SIP creation
    • He thinks he still need to look at the thread creation (SIP creation)... looks like some threads spawn and aren't removed. Deciding how to manage that, might get bumped to 0.9.
  • Peter suggests to have a scalability refactor discussion very early on in the 0.9 development schedule.
  • There are lot of remaining issues, a Monday code freeze is not realistic
  • We can bump code freeze by a week, that then still leaves 2 weeks between code freeze and release.
  • Evelyn to update the issue list and mark more criticals now that we're getting close
  • Austin: ace is up and monitoring ~1000 documents
  • Meeting scheduled on Mon, Nov 14 11am

Documentation

Evelyn updated Significant characteristics of raster images wiki page

Deployment

  • Tomorrow, CVA and UBC
  • Evelyn and Austin will do the RAC install the week of Dec 12
    • That could get us an extra week in the 0.8 dev schedule